UK-DE-AT-FR-BE
bricoflor.co.uk
  • germany - bricoflor.de
  • austria - bricoflor.at
  • france - bricoflor.fr
  • belgium - bricoflor.be
  • UK - bricoflor.co.uk
  • italy - bricoflor.it
  • poland - bricoflor.pl
  • spain - bricoflor.es
  • netherlands - bricoflor.nl
bricoflor.co.uk
All Prices include VAT
01264 980370
  • order unit: 22 carpet tiles

Milliken Hub "HUB13 Critical Path"

Milliken Hub "HUB13 Critical Path"

Milliken
  • Tufted, Level Loop Pile
  • with StainSmart® (soil release, liquid repellence)
  • 11% Recycled content by total product weight
  • GUT & CRI Green Label Plus certified for indoor air quality

>>> See Milliken Hub now in digital room view <<<

Delivery Charges
£10.00 per order
Delivery Time
3-5 working days (if available)
If you are ordering in bulk, we can make you a quote! Request an
offer now!
£6.70 per carpet tile incl. VAT
correspond to £26.80 per m²
Can’t find the product you are looking for? We have all Milliken products available. Please contact us.

Product characteristics: Milliken Hub "HUB13 Critical Path"

Surface Loop Pile
Total Thickness 8.8 mm
Total Weight 3700 g/m² (contains 11% recycled material)
Gauge 40 / 10 cm
Pile Height 3.0 mm
Pile Weight 420 g/m²
Impact Noise Reduction 30 dB
Burning Behaviour Cfl-s1
Pile Material 100% Nylon
Width 50 x 50cm
backing Cushion Backing (Including 90% Recycled Open-cell Polyurethane Foam!)

Product features

Milliken Hub stands for high-quality carpet tiles with a long lifespan. If you are looking for a resilient flooring material that will last for many years, especially in commercial areas, then look no further. You can choose from numerous natural colours, all of which share the same striped design. The irregular stripes are going different directions and create a modern design that will complement any interior. On top of that, the striped surface will make stains hard to spot. This way, Milliken Hub is the ideal floor for busy offices and other commercial areas with a lot of footfall. This outstanding product is designed to withstand heavy commercial use and comes with a 12-year wear warranty (when installed in commercial areas). The yarn is made from 100% nylon, a material that is well known for its resilience and durability. There are two backings available for these tiles. The standard backing contains 90% recycled material and TractionBack® (which is only available on request and comes with additional charges) facilitates installation. Since these Milliken carpet tiles are loose laying, you can install them without using adhesives. A glue-free installation brings numerous advantages, as your new floor will be walkable immediately after the installation and you will have a better indoor air quality. These tufted loop pile carpet tiles are the ideal floor for everyone looking for a resilient floor that will succeed in creating a modern and welcoming atmosphere.

;